CN EN
Location:Home > Cases and application references > Zhuhai Amphenol Manufacturing Floor-Scrubber Application
Back to cases and application references Historical project case Zhuhai · Warehouses and production workshops

Zhuhai Amphenol Manufacturing Floor-Scrubber Application

At Amphenol's Zhuhai warehouse and workshop, a DP500 scrubber was used to clean accumulated dust from terrazzo floors.

Zhuhai Amphenol Manufacturing Floor-Scrubber Application
City / RegionZhuhai
Customer / Organization typeElectronic connectors and precision manufacturing
Site scaleSeveral thousand square metres
Equipment directionWarehouse、Production workshop
01

Site problems

Large area

02

Equipment configuration

Historical equipment: DP500 scrubber for simultaneous floor washing and wastewater recovery

03

Configuration objectives

Historical material confirms DP500 use to clean accumulated dust from terrazzo in this manufacturing setting.

Site challenges

The site problems to address

  • Large area
  • Manufacturing areas require control of airborne dust and residual floor water.
  • Equipment must suit warehouse and production-aisle access.
Equipment configuration

Allocate equipment and consumables by task

Historical equipment

DP500 scrubber for scrubbing floors while recovering wastewater.

Confirm current alternatives against specifications and site conditions.
Potential application value

Compare the configuration with your own site

Historical material confirms DP500 use to clean accumulated dust from terrazzo in this manufacturing setting.

Acceptance criteria

How to verify that equipment, consumables and attachments address the task

Check objects, coverage, safety, results, reopening time and handover records against the site's agreed criteria.

Images and performance data require traceable records. Without complete evidence, describe configuration logic rather than inventing customers, results or numbers.

Operating process

What to do first and which equipment to use next

  • Confirm area, materials, pollutants and shifts before planning pretreatment, equipment work and acceptance.
Cleaning chemicals

Select for pollutants and floor material

  • Chemicals must suit the floor or cleaning object; test a small area and dilute according to product instructions.
Accessories and consumables

Make equipment and consumables work together

  • Maintain model-specific brushes, blades, filters, hoses and common wear parts.
Further information

Application background

washing.

Cleaning requirements

Cleaning difficulties and operating conditions

Large areas require dust and residual-water control plus equipment access suited to storage and production aisles.

Historical equipment configuration

Historical DP500 scrubber for washing and recovery; confirm any current alternative against specifications and the new site.

Implementation records

Application objectives

cleaning.

Image information

site.

— FAQ

Can the equipment model in this case still be purchased directly?
Preserve documented historical model facts. Select current models afresh by area, floor, contamination, access and shifts; they are not automatic replacements.
Can another site directly reuse this configuration?
Do not copy the configuration directly. Assess area, material, pollutants, aisle width, utilities and staffing for the new site.
What do the images represent?
Application photo gallery.
What site information is needed before selection?
Provide cleaning area, aisle width, flooring, main pollutants, shifts, utilities and photos to assess access, cleaning arrangement and runtime requirements.
What support can be discussed after equipment delivery?
Agree trials, training, wear parts, consumables, daily inspection and maintenance support for the actual project; scope is subject to that agreement.
Related products

Equipment for similar tasks

FAQ

Zhuhai Amphenol Manufacturing Floor-Scrubber Application — FAQ

Who can use this reference?

Connector and precision-manufacturing reference; reassess area, aisles, pollutants, shifts, utilities and wastewater before reusing the configuration.

Can this equipment configuration be copied directly?

The reference explains task allocation. Reconfirm models, quantities, chemicals, attachments and backup equipment for the new site.

How should images and cleaning results be verified?

Images and performance data require traceable records. Without complete evidence, describe configuration logic rather than inventing customers, results or numbers.

How should a similar project's handover be checked?

Check objects, coverage, safety, results, reopening time and handover records against the site's agreed criteria.

What delivery support can Wan Sheng Long discuss?

Discuss requirements, selection, trials, training, consumables, attachments, wear parts and maintenance support; confirm scope in the plan and handover documents.

Further references

More related project and application references