CN EN
Jinjie J-1575L High-flow high-pressure pipe jetter banner
Jinjie · pipe jetting equipment

JinjieJ-1575L High-flow drain-jetting/washing machine

This machine is more suitable for outdoor flushing and drainage areas with continuous water sources and discharge conditions. The machine's overall flow rate of 75 L/min focuses on the requirement for carrying away debris. The work is organized in segments based on the inspection wells.

150bar(15MPa)75L/minPetrol power

01 Intended use

For outdoor flushing and drainage with continuous water supply and sewage collection conditions, focus on the overall water capacity and downstream treatment; do not equate high flow rates with faster completion of all tasks.

02 Key performance figures

150 bar (15 MPa)combined with the machine's 75 L/min water flow, focuses on matching water volume with the cleaning and discharge task; it does not promise higher pressure or longer cleaning distance through a high flow rate.

03 Working configuration

Gasoline main unit, working hose, and adapter nozzle are selected according to the flushing task; surface flushing attachments are optional, and interfaces and operating conditions are confirmed separately

Product and operation video

The J-1575L and its applications

View the model's appearance and operation; discuss configuration against actual site conditions.

J-1575L Selection Consultation

Provide cleaning tasks, site conditions and frequency to confirm suitable configuration.

Enquire about this model
Start with your site

Where is the pipe that needs treatment? From your task begins.

Around 75 L/min total water supply, prioritize continuous water supply and waste collection during selection. First find the closest task, then judge based on site conditions.

What would you like to clean?

What maintenance aspects need to be considered together for the pipeline?

When choosing J-1575L, consider the actual pipeline and the following issues together to avoid comparing only one parameter.

With a large water volume, the accompanying preparations cannot be omitted.

Continuous water supply, downstream discharge, and waste collection need to be judged as part of the same task.

Flow rate numbers cannot be converted to processing distance

Elbows, resistance, nozzles, and blockages will still change the propulsion and recovery conditions

In addition to the flush and drain, there is a full shift.

Water replenishment, waste removal, and parking and organization also take time, and cannot be judged solely based on continuous spraying for a period.

Site conditions, configuration and selection

J-1575L, how do you match your pipeline conditions?

75 L/min total water supply, the continuous water supply and waste collection should be prioritized in the selection. Specific configurations still need to be combined with the machine's documentation, pipeline conditions, and trial operation to confirm.

01 Continuous Discharge Task

Stable water source, silt, and downstream discharge.

02 Check between manholes pipelines

Well distance, elbows and hose retrieval conditions

03 outdoor maintenance at multiple sites

Fuel, water replenishment, and waste removal.

04 55 compared to 75 L/min configuration

Actual water source, waste material, and complete task

Field or taskConfiguration and conditions of interestJ-1575L Selection Judgment
Continuous flushing and discharge taskStable water source, silt, and downstream discharge.First determine whether the water supply and waste disposal can be coordinated, then arrange for segmented operations.
Piping between inspection wellsWell distance, elbows and hose retrieval conditionsThe effective distance is affected by the hose resistance and the working attachment, and cannot be directly estimated based on flow rate.
Multi-point outdoor maintenanceFuel, water replenishment, and waste removal.Include the supply, transition, and wrap-up phases into the shift, and do not use the overall machine value to replace the on-site output.
Comparison between 55 and 75 L/minActual water source, waste material, and complete taskComparing the same pipeline conditions and finishing requirements, a larger water volume does not directly prove lower costs.
Clean pipe diameter and inletClear pipe bore, pipe material, narrowest access point and bendsProvide dimensions or a pipeline diagram to determine whether the nozzle and working pipe can enter, bend, and safely retrieve.
Pipe length and segment division.Two well spacing, elbow count, and available working hose lengthSeparate the length of the work hose from the actual reachable distance; first evaluate the segment plan for long lines or complex bends.

Bring these four sets of on-site documents together and assess them collectively.

  1. Clean pipe diameter, pipe material, total length, well distance, elbows, and blockage indications such as oil, sand, or hard objects.
  2. Inlet size, nozzle outer diameter, connection, working pipe length, and advance and recovery routes
  3. Open the outdoor area, fuel, and transfer conditions, as well as a continuous water supply.
  4. Discharge destination, daily working hours, and maintenance schedule.
Place the equipment at the site.

Application scenarios and operating conditions of J-1575L

Use the existing scenario diagram for this model. Specific configurations and On-site conditions can Be discussed together with photos

J-1575L Drain jetting

J-1575L | Pipe jetting

First determine whether the water supply and waste disposal can be coordinated, then arrange for segmented operations.

J-1575L Access-chamber washing

J-1575L | On-site cleaning reference

Combine the on-site waste, working attachment, and water supply and drainage arrangements, with specific results observed through same-condition trial runs.

Configuration and technical parameters

First understand several configurations related to the job

Pressure indication, overall flow, and power should be compared; working pressure, maximum pressure, and allowable operating conditions also need to be verified against the corresponding technical data.

Pressure indication

150bar(15MPa)

Overall flow rate indication

75L/min

Power type

Petrol power

Full specifications for View +
Product modelJ-1575L
Pressure indication150bar(15MPa)
Overall flow rate indication75L/min
Power typePetrol power

Flow rate is not a guarantee for the diameter or distance of the pipe that can be cleared. Actual progress, flushing, and operation time are also affected by the pipeline, nozzle, water supply, and blockages.

Exterior view of the J-1575L
Appearance of J-1575L product
Look at the picture to understand the equipment.

Components and their functions

The left figure shows the overall appearance of this model, with six items indicating functional descriptions; do not misrepresent general descriptions as internal structure diagrams.

01 frame and transport

Park the main unit according to the outdoor point arrangement and move it for transfer, leaving space for the hose entry and exit and on-site passage.

02 Power and Supply

The gasoline-powered model is convenient for moving between locations without fixed power sources; water supply, fuel, and exhaust conditions should be implemented simultaneously.

03 high-pressure pump and water source

A machine flow rate of 75 L/min needs a continuous water supply. Check the pump type and allowable operating conditions in the documentation for the machine.

04 work pipe and fitting

Maintain records of continuous water supply and usage of the nozzle, and check the inlet, working hose, and connections as per the instructions. Do not assume component compatibility based on the overall machine flow.

05 nozzle and flushing

Select an appropriate nozzle based on the pipe material, blockage type, and inlet; arrange the advancement, retraction, and direction of the waste together.

06 coiling and operation of the hose

Rolling, retrieving, and parking the hose according to the machine's configuration, record the condition of the working hose and fittings after cleaning.

Operating principle

From the pump group pressurization, to the nozzles scrubbing and the removal of the dirt.

Look at the direction of clean water flow and waste matter, then determine how to coordinate with your pipeline. This is a general jetting process explanation. Specific operations are carried out according to the machine's manual and training.

01 Pump Group Pressurization

The gasoline engine drives the pump unit, which pressurizes the incoming water and sends it to the working hose. The main unit is arranged in an open outdoor area, with fuel and continuous water supply prepared.

02 Work Pipe Transport

The water is delivered to the jetting nozzle via the work hose; the length, bend, and connection conditions affect the end conditions, and the hose length is not equal to the effective jetting distance.

03 nozzle directional flushing

Match the nozzle with the piping according to the continuous flushing task, and the overall machine flow does not represent that each working attachment can reach the maximum at the same time.

04 Water flow with contamination and collection

Continuous flushing and discharge require synchronized scheduling of water source, downstream discharge, and waste collection, combined with segmented treatment at inspection wells to avoid re-depositing waste downstream.

Professional configuration

How do the work hose, spray nozzle, and reel structure work together to perform tasks?

First, clarify the pipeline and waste, then match the working hose, jetting nozzle, and water supply and drainage. Whether the accessories are standard and their specific specifications are subject to the delivery list of this model.

How to coordinate pressure and water volume with the task?

150 bar (15 MPa) combined with a 75 L/min water flow focuses on matching water volume with the cleaning and discharge tasks; it is not about using a high flow rate to promise higher pressure or longer cleaning distance. The pressure and hose diameter should be based on the machine's specifications, and the maximum pressure cannot be considered as the continuous working pressure.

How to select the appropriate work hose based on pipe diameter and pipe length?

Pipe diameter limits nozzle size and clearance. Assess pipe length together with bends and access points. The hose length in the machine specification alone does not establish how far a blockage can be cleared.

Different blockages require different working attachments

Distinguish between oil, loose sand, and hard objects blocking; select separately the internal spray nozzles and surface cleaning attachments, and check the hole size, interface, and pressure according to the specifications of this machine.

Correspondence between nozzles, work pipes, and pipeline tasks
What does the customer provide?What needs to be matchedHow to make a selection and judgment?
Clear pipe diameter, inlet, and elbowNozzle outer diameter, working pipe and connection formVerify whether it can enter, turn, and retrieve, not only comparing the cleaning pressure.
Oil, sand, or other blockagesNozzle spray form, pressure flow and pipe material resistanceFirst, distinguish between soft, removable debris that can be flushed and hard objects or blockages that require separate handling.
Total length of the pipeline and distance between the two wells.Working hose length, hose winding and segment position.The length is determined based on the actual delivery, combined with the end conditions, and no fixed effective distance is promised.
Pipe jetting or auxiliary surface cleaning.Specialized pipe jetter nozzle or corresponding cleaning attachmentTwo types of tasks should be checked separately against the interface, operating conditions, and delivery list; no conclusion can be drawn from the display images regarding the standard configuration.

Combine the machine's details for further understanding of the configuration.

J-1575L · Pump area and running gear
J-1575L · Pump area and running gear
J-1575L · Pump head and petrol-power area
J-1575L · Pump head and petrol-power area
Comparison of similar models

How do I choose between J-1575L and similar configurations?

First, check the pipeline task, then compare the power and pressure ratings and water volume. Boundary models use task or power references, which do not necessarily mean the left or right model is smaller or larger.

Comparison criteriaAppearance of J-1555L productJ-1555L →Appearance of J-1575L productJ-1575L →Appearance of J-2050H productJ-2050H →
Pressure indication150bar(15MPa)150bar(15MPa)200bar(20MPa)
Overall flow rate indication55L/min75L/min50L/min
Power typePetrol powerPetrol powerPetrol power
What is the main focus of this product?55 L/min total flow; the entire machine and single gun operating conditions should be selected separately.75 L/min total water supply, prioritize continuous water supply and waste collection when selecting the machine.Gasoline-powered outdoor sweepers, 50 L/min discharge and water supply and drainage coordination.
Power and site arrangementOpen the outdoor area, fueling station, and dispersed points for transfer.Open the outdoor area, fueling station, and dispersed points for transfer.Open the outdoor area, fueling station, and dispersed points for transfer.
Tube and working attachment attention.Operate the working attachment according to the machine's hose reel design, interface, and task configuration.Operate the working attachment according to the machine's hose reel design, interface, and task configuration.Black roll pipe adapter; compatible with work pipe and nozzle

Pressure diameter, flow test conditions, and specific configuration need to be confirmed separately; they should not be based on the highest numerical promise for applicable pipe diameter, distance, or shift output.

Operating cost

How to calculate the complete cost of a single pipeline maintenance?

Treat continuous flushing as a specific task and count it according to the four stages: preparation, operation, resupply, and conclusion.

Prepare for actual manual work.

Focus on recording water supply preparation, actual flushing and discharge, water replenishment waiting, and wastewater transportation, evaluating the complete task without committing to a lower single cost.

Energy, consumables, and disposal

Record the amount of gasoline, actual water used, wear and tear of the work hose and nozzle, daily maintenance, and waste disposal separately.

Compare under the same task.

Compare the same pipeline, same completion requirements, and same cycle. Procurement costs and depreciation allocation are not added redundantly, and no preset savings ratio or payback period is assumed.

MAINTENANCE

Before and after each operation, check these positions.

Specific steps, maintenance cycles, and disassembly requirements shall be followed according to the machine's manual and training, and the web is not to be used instead of the maintenance manual.

Site checks before work begins

Stable water source, silt, and downstream discharge are key factors. After the task changes, re-evaluate and do not follow the previous on-site conclusion.

Work hose and fitting.

Maintain records of continuous water supply and usage of the nozzle, and check the inlet, working hose, and connections as per the instructions. Do not assume component compatibility based on the overall machine flow.

Correspondence between nozzles and task records

Record the type of pipe material, the type of blockage, and the type of nozzle used, and inspect for visible damage; the cleaning method should be carried out according to the machine's instructions.

Power and Accessories

Check and maintain the machine according to the gasoline power instructions. The maintenance cycle, fuel type, or electrical requirements cannot be applied to similar models.

Feed and retrieve the hose and park the machine.

Follow the machine training to organize the work hose, coil hose, and body, record abnormalities, and do not carry over unresolved faults into the next task.

Abnormal Feedback

Retain the model, configuration, operation time, and abnormal phenomena; after following the instructions to stop the machine, contact after-sales service, and do not attempt to disassemble the hose under pressure or modify the protection settings on your own.

Delivery and after-sales service

Six delivery and after-sales services, with corresponding support before and after use

Service scope, costs, and on-site arrangements are confirmed based on the actual project and agreement.

Delivery inspection

Check the equipment, configuration, and random documents together before delivery.

Operator training

Combine the machine's working pipe, nozzle, and on-site conditions for understanding operations.

Usage guidance

Bring the model number, pipeline conditions, and usage issues for communication.

Parts supply

Check the work hose, nozzle, fittings, and consumables against the machine version.

On-site fault repair

Service scope, costs, and arrival arrangements should be confirmed in advance.

Scheduled on-site maintenance

Combine usage frequency, location, and actual agreement arrangements.

— FAQ

You may also be interested in J-1575L

Bring in the specific pipeline conditions you are concerned about, and continue to communicate the specific configuration.

What is the most important feature to consider when selecting J-1575L?

For outdoor flushing and drainage with a continuous water source and sewage collection conditions, focus on the machine's water capacity and downstream treatment. Do not equate high flow rates with faster completion of all tasks. Specific applicability still depends on the pipeline, blockage conditions, and site conditions, and is not guaranteed by the model name.

How should pressure and flow be viewed respectively?

At 150 bar (15 MPa) and a total flow of 75 L/min, compare the water available with the flushing task. Flow alone cannot establish pressure or reach. Verify the stated rating, maximum pressure and continuous operating range separately. The type of blockage also determines what the jet can clear.

How should check pits with large water discharge be segmented?

First, check the well spacing, sediment in the pipes, and the smoothness of the downstream flow to arrange the feeding and retrieval of the hose and the collection of wastewater; do not directly convert the total water volume of the machine to effective distance.

What are the on-site conditions required for the machine's power?

Gasoline internal combustion engines are not used in indoor or semi-enclosed spaces; even in open outdoor areas, exhaust, fuel, fire sources, water supply, and drainage must be arranged according to the instructions.

Are the jetting accessories shown included as standard?

No. A spray bar, rotary head or surface cleaner can be specified for the job. Check the nozzle, connection and operating range for each tool, and confirm the supplied accessories on the order.

Will a flow rate of 75 L/min speed up every job?

75 L/min is the overall flow rate of this machine. Continuous water supply, nozzle, pipeline, and drainage will affect the operation, and cannot be directly converted into single gun output, processing distance, or fixed efficiency.

Where should daily maintenance begin?

Keep the original manual and configuration sheet. Check the water source, working hose, nozzle, fittings, coiled hose, and power status according to the instructions. Do not use cycle, oil type, and disassembly information from other models.

What to do in case of pressure fluctuation, water leakage, or abnormal hose insertion/removal?

First, follow the machine's instructions to shut down and handle the machine. Record the water supply, nozzle, pipeline, and any abnormal phenomena, then contact after-sales service. Do not disconnect the pipe without pressure, and do not adjust the safety valve setting on your own or force the pipeline to be sent.

J-1575L in use
Product enquiry

Let's talk about your pipelines to see if J-1575L is suitable

First discuss the actual pipeline of continuous flushing tasks, then organize the stable water source, silt, and downstream discharge with daily work schedule together.

Phone consultation:0755-25621811

Start with the actual pipeline and together determine the configuration.

Focus on recording water supply preparation, actual flushing and discharge, replenishment waiting, and wastewater transportation. Evaluate the task in its entirety without committing to a lower single-cost approach. Communicate with the site or arrange a trial run if needed.