01 Intended use
- Road sweeping and waste transport
- Match the route to the actual R-version equipment. Check compatibility separately for other versions.
The Jinjie J-WX2400R enclosed road sweeper combines 2400 mm coverage and a listed 200 L tank for open roads and campus main routes, coordinating sweeping, driving, water and waste handling.
48 V 200 Ah and a 200 L water tank for assessing frequent long-route sweeping.
Charging, water and emptying affect shifts on frequent estate, road and industrial-yard routes.
Road width, debris volumes, emptying distance, water points and shifts all affect actual productivity.
For height restrictions or dust-control requirements, confirm whether the current sales configuration fits before purchase.
Check widths, height limits and turning space before driving configuration, the 48 V 200 Ah supply and 200 L water arrangement. Trial actual debris and routes to compare collection, dust and disposal by task and shift.
Clear road width, kerbs, leaf load and pedestrian hours
Waste type, traffic, surface and distance to disposal
Gate height, narrowest section, columns and gradients
Pedestrian traffic, obstructions, level changes and disposal arrangements
Check access, debris and work patterns at the site when specifying the machine.
| Site type | Configuration and operating conditions to check | Selecting J-WX2400R |
|---|---|---|
| Residential and industrial estate roads | Clear road width, kerbs, leaf load and pedestrian hours | Check the footprint of J-WX2400R with the brushes deployed and plan the rounds for the debris load. |
| Factory and warehouse yards | Waste type, traffic, surface and distance to disposal | Separate sticky, entangling and special materials. Test collection and dust control on a representative stretch. |
| Car parks and connecting lanes | Gate height, narrowest section, columns and gradients | Check overall height, turning space and room to pass safely. Sweeping width alone cannot determine access. |
| Campus and public roads | Pedestrian traffic, obstructions, level changes and disposal arrangements | Choose a suitable time and arrange parking, disposal and maintenance before setting the route. |
Confirm selection against site measurements, the specified configuration and a representative trial.

For frequent long routes, use 48 V 200 Ah and the 200 L tank to assess electric sweeping and replenishment arrangements.

Industrial yards with dust, grit and paper require checks of road width, emptying points and charging.

Long outdoor shifts make the operator environment important; confirm comfort equipment and height clearance against the sales configuration.
Review day-to-day configuration first. Expand the full specifications for more detail.
| Key operating figures | |||
|---|---|---|---|
| Effective sweeping width | 2400mm | Theoretical calculation speed | 12 km/h |
| Theoretical sweeping coverage (calculated) | 28800㎡/h | Water tank | 200 L: for sweeping dust control and replenishment planning; capacity does not establish fixed runtime. |
| Enclosed-cab operation | For longer operator-driven road work; confirm air conditioning and other comfort options against this model's sales configuration. | Work rhythm | Assess productivity against route length, debris volume, emptying points, water points and shifts. |
| Sweeping coverage / debris collection | Confirm sweeping width, hopper capacity and emptying method for the current sales configuration. | Task-specific dust-control configuration | For demanding dust-control needs, confirm the appropriate auxiliary suppression configuration before purchase. |
| Access conditions | Check road width, turns, gradients, height restrictions, mixed traffic and parking. | Configuration conditions | Confirm height clearance and special configurations against the current sales specification; they are not assumed capabilities. |
| Drive and electrical system | |||
| Battery | 48 V 200 Ah: assess long electric routes and shifts; check charging locations, route length and gradients on site. | ||
Calculated as effective sweeping width × the website's standard theoretical speed of 12 km/h. Maximum travel speed remains a separate specification and is not used in this formula. The result is not actual or measured productivity.
Assess how coverage, collection, driving arrangements, dust control, emptying points and access affect actual work, rather than comparing numbers alone.
Use the exterior view for operating and maintenance orientation. Consult component documentation for internal locations.

Check machine clearance and turns on the routine road-cleaning route.
The main brush sweeps the floor. After shutdown, inspect it for wear and entanglement.
The side brush guides loose debris towards the sweeping path. Keep clearance from edges.
Empty according to waste volume, weight and disposal arrangements.
Check media, seals and water use against the supplied configuration.
The operator steers and yields to traffic. Maintain the power system according to the handover instructions.
This diagram explains the functions. Refer to the supplied instructions for installed parts, switching sequences and maintenance procedures.
The side brush guides suitable loose debris into the main brush path. Maintain safe kerb clearance.
The main brush sweeps and transfers debris. Brush condition, the surface and the material affect pickup.
Plan disposal around the actual hopper load and distance to the emptying point.
Assess dust collection, filter cleaning and water use on site. Shut down for end-of-shift maintenance.
Assess filtration, collection, seals and maintenance together. A filter-area or motor rating alone cannot predict dust at the site.
Identify wet, sticky, hazardous, combustible or toxic material before sweeping. Special dusts require a separate method and suitable equipment.
Identify the filter media, seals and cleaning method. Use spray only where the configuration and surface permit, and maintain the filter as specified.
During a trial, record dust, residue, pickup and maintenance frequency. Stop safely if anything appears abnormal. Confirm washability before rinsing the filter.
Compare access, debris load, turning space and configuration. Equal sweeping widths do not establish equal size or performance.
| Comparison criteria | Options with equivalent sweeping width J-WX2400B → | Current model J-WX2400R → | No larger comparable model is currently listed. |
|---|---|---|---|
| Sweeping width | 2400mm | 2400mm | — |
| Hopper | Confirm capacities and battery details from the current configuration sheet to plan water, emptying and shifts. | Ask about this option when specifying the machine. | — |
| Water tank | Confirm capacities and battery details from the current configuration sheet to plan water, emptying and shifts. | 200L | — |
| Selection checks | Check clear road width, debris, turning room and supply points. | Check clear road width, debris, turning room and supply points. | No comparable product is currently listed in this category. |
Record sweeping, collection and disposal over the same period and to the same standard. Measure actual output on site.
Labour cost = crew size × hours per person × hourly rate. Record preparation, cleaning, transfers and close-down separately.
Include operation or supervision, energy, consumables, disposal and maintenance. Allocate equipment and battery costs over a suitable service period.
Record daily operating hours, routes, garbage or contaminants, and supply and shutdown times; under the same conditions, compare, and do not commit to any savings ratio that has not been calculated.
Shut down safely before checking brushes for wear and entanglement. Keep hands clear of moving parts.
Empty before reaching volume or weight limits. Hopper capacity alone does not specify safe payload.
Check installed parts for dust loading, damaged media and leaks. Wash only media approved for washing.
Check the supplied batteries, charger and charging conditions. Have a qualified technician investigate overheating, damage or electrical faults.
Record changes in level, obstacles, traffic and difficult sections. Reassess the route when conditions change.
Check drive, braking and parking as instructed. Stop if you hear abnormal noise or feel unexpected resistance.
Replace according to the manual, observed wear and duty. Supply the model, version and original part details when ordering.
Assess open campus main roads, factory perimeters and longer hard-surface routes. Match 2400 mm coverage to road space and check gates, height limits and stopping locations.
Use the specified water system, trial consumption and supply distance and maintain filters, seals and cleaning together. Tank capacity alone does not establish fixed operating hours.
Assess visibility, boarding, turning, braking and height limits and confirm comfort options in the list. Trial the route so drivers know obstacles and safe stopping points.
Segment by debris concentration, remove entangling and large objects first and observe brush gathering and collection. Record volume, weight and disposal travel for safe routing.
Check the actual battery, charger and route load and record sweeping, waiting, disposal and water. Schedule charging and handover around the task and staff supplies.
After shutdown, empty waste and check brushes, filters, seals, water and charging connections. Inspect driving and brakes as instructed and retain model-specific parts and fault records.
Both list 2400 mm coverage; R lists 200 L water and A 300 L. Compare actual water needs, routes, driving, power, disposal and care rather than tank size alone.
Share routes, clearances, debris and shifts to agree trials and configuration. Handover covers driving, brushes, filtration, water and care, with model-specific consumable support.
The agreed service terms specify scope, charges and timing.
Before handover, check the equipment, accessories and configuration against the conditions on site.
View service support →Training covers driving or task operation, cleaning and safe shutdown for the equipment supplied.
View service support →Describe the surface, debris and schedule when discussing an operating issue.
View service support →Identify spares by the machine model, version and original part.
View service support →Confirm service area, charges and attendance arrangements in advance.
View service support →Agree on maintenance arrangements based on usage, location and condition.
View service support →
Tell us about the roads, debris and daily rounds so we can check the suitability of J-WX2400R.
Phone consultation: 0755-25621811
Provide road width, route length, debris types, height clearance, water points, charging and sales-configuration requirements.