01 Intended use
- Continuous sweeping on wider roads
- Check the driving configuration for this model. Models with equal sweeping width can have different operating requirements.
The Jinjie J-XS2100Q wide road sweeper uses 2100 mm effective coverage for broader campus and factory main roads, coordinating driving, collection, filter cleaning and supplies.
Organize routine open-road sweeping around routes and debris conditions.

For large properties, estate main roads and open yards with leaves, paper, grit and ordinary loose dust.

For factory main roads, logistics parks and warehouse perimeters; check entrances, turns, mixed traffic and emptying arrangements.

For longer, more open public-perimeter routes, organized by debris types and work windows.
Long estate and factory-perimeter routes occupy staff and time when swept repeatedly by hand.
Leaves and paper keep accumulating; plan emptying points and sweeping frequency against volumes.
Check entrance, corner and mixed-traffic access and safe passing space beforehand.
Measure wide routes and connecting gates separately and assess height limits, tight turns and traffic. Trial representative debris and compare edge collection, dust and disposal. For equal-width machines, check driving, power and actual configuration.
Clear road width, kerbs, leaf load and pedestrian hours
Waste type, traffic, surface and distance to disposal
Gate height, narrowest section, columns and gradients
Pedestrian traffic, obstructions, level changes and disposal arrangements
Check access, debris and work patterns at the site when specifying the machine.
| Site type | Configuration and operating conditions to check | Selecting J-XS2100Q |
|---|---|---|
| Residential and industrial estate roads | Clear road width, kerbs, leaf load and pedestrian hours | Check the footprint of J-XS2100Q with the brushes deployed and plan the rounds for the debris load. |
| Factory and warehouse yards | Waste type, traffic, surface and distance to disposal | Separate sticky, entangling and special materials. Test collection and dust control on a representative stretch. |
| Car parks and connecting lanes | Gate height, narrowest section, columns and gradients | Check overall height, turning space and room to pass safely. Sweeping width alone cannot determine access. |
| Campus and public roads | Pedestrian traffic, obstructions, level changes and disposal arrangements | Choose a suitable time and arrange parking, disposal and maintenance before setting the route. |
Confirm selection against site measurements, the specified configuration and a representative trial.
Review day-to-day configuration first. Expand the full specifications for more detail.
| Key operating figures | |||
|---|---|---|---|
| Effective sweeping width | 2100mm | Theoretical calculation speed | 12 km/h |
| Theoretical sweeping coverage (calculated) | 25200㎡/h | ||
Calculated as effective sweeping width × the website's standard theoretical speed of 12 km/h. Maximum travel speed remains a separate specification and is not used in this formula. The result is not actual or measured productivity.
Calculated from this model's effective sweeping width × the website theoretical speed of 12 km/h. For theoretical area comparison only, not actual or measured productivity.
Use the exterior view for operating and maintenance orientation. Consult component documentation for internal locations.

Check overall dimensions and turning room even on wider roads.
The main brush sweeps the floor. After shutdown, inspect it for wear and entanglement.
The side brush guides loose debris towards the sweeping path. Keep clearance from edges.
Empty according to waste volume, weight and disposal arrangements.
Check media, seals and water use against the supplied configuration.
The operator steers and yields to traffic. Maintain the power system according to the handover instructions.
This diagram explains the functions. Refer to the supplied instructions for installed parts, switching sequences and maintenance procedures.
The side brush guides suitable loose debris into the main brush path. Maintain safe kerb clearance.
The main brush sweeps and transfers debris. Brush condition, the surface and the material affect pickup.
Plan disposal around the actual hopper load and distance to the emptying point.
Assess dust collection, filter cleaning and water use on site. Shut down for end-of-shift maintenance.
Assess filtration, collection, seals and maintenance together. A filter-area or motor rating alone cannot predict dust at the site.
Identify wet, sticky, hazardous, combustible or toxic material before sweeping. Special dusts require a separate method and suitable equipment.
Identify the filter media, seals and cleaning method. Use spray only where the configuration and surface permit, and maintain the filter as specified.
During a trial, record dust, residue, pickup and maintenance frequency. Stop safely if anything appears abnormal. Confirm washability before rinsing the filter.
Compare access, debris load, turning space and configuration. Equal sweeping widths do not establish equal size or performance.
| Comparison criteria | Options with equivalent sweeping width J-XS2100 → | Current model J-XS2100Q → | Wider-coverage option J-WX2400A → |
|---|---|---|---|
| Sweeping width | 2100mm | 2100mm | 2400mm |
| Hopper | 240L | Ask about this option when specifying the machine. | Ask about this option when specifying the machine. |
| Water tank | 180L | Ask about this option when specifying the machine. | 300L |
| Selection checks | Check clear road width, debris, turning room and supply points. | Check clear road width, debris, turning room and supply points. | Check clear road width, debris, turning room and supply points. |
Record sweeping, collection and disposal over the same period and to the same standard. Measure actual output on site.
Labour cost = crew size × hours per person × hourly rate. Record preparation, cleaning, transfers and close-down separately.
Include operation or supervision, energy, consumables, disposal and maintenance. Allocate equipment and battery costs over a suitable service period.
Record daily operating hours, routes, garbage or contaminants, and supply and shutdown times; under the same conditions, compare, and do not commit to any savings ratio that has not been calculated.
Shut down safely before checking brushes for wear and entanglement. Keep hands clear of moving parts.
Empty before reaching volume or weight limits. Hopper capacity alone does not specify safe payload.
Check installed parts for dust loading, damaged media and leaks. Wash only media approved for washing.
Check the supplied batteries, charger and charging conditions. Have a qualified technician investigate overheating, damage or electrical faults.
Record changes in level, obstacles, traffic and difficult sections. Reassess the route when conditions change.
Check drive, braking and parking as instructed. Stop if you hear abnormal noise or feel unexpected resistance.
Replace according to the manual, observed wear and duty. Supply the model, version and original part details when ordering.
Assess wider continuous hard-surface routes with ordinary leaves, paper and grit. Plan passes with 2100 mm coverage while measuring gates, tight turns and parked vehicles.
Assess actual roads and connections rather than total area. Compare coverage and disposal on long wide routes and prioritise access on narrow or turning-intensive routes.
Organise continuous passes along the road, coordinating side and main brushes. Assess tree pits, barriers and tight corners separately and plan safe clearance and manual finishing.
Record volume, weight and collection in a trial and check actual capacities and permitted loads. Define disposal, water and charging locations before work to avoid unplanned returns.
Distinguish ordinary dust from special material and assess filtration, sealing, cleaning and suppression. Observe dust and residue and include filter care in shifts rather than judging by water alone.
After safe shutdown, empty waste, inspect brushes and service filters, then check driving, brakes and power. Record faults and consumable needs for the next shift and parts purchasing.
Both list 2100 mm coverage. Compare access, driving, power, collection and supplies and trial the complete collection, maintenance and disposal task with the intended team.
Share routes, clear widths, debris distribution and work windows to agree equipment and trials. Handover confirms driving, filter cleaning, unloading, care and model-specific consumables.
The agreed service terms specify scope, charges and timing.
Before handover, check the equipment, accessories and configuration against the conditions on site.
View service support →Training covers driving or task operation, cleaning and safe shutdown for the equipment supplied.
View service support →Describe the surface, debris and schedule when discussing an operating issue.
View service support →Identify spares by the machine model, version and original part.
View service support →Confirm service area, charges and attendance arrangements in advance.
View service support →Agree on maintenance arrangements based on usage, location and condition.
View service support →
Tell us about the roads, debris and daily rounds so we can check the suitability of J-XS2100Q.
Phone consultation: 0755-25621811
Provide road width, route length, debris types, emptying and water points, charging and access restrictions.