Typical application
Outdoor hard-surface pressure washing: lance, optional bars and water handling
Identify the object before power, material tolerance, delivered configuration and waste destination. More pressure is not automatically more suitable; a pictured accessory is not necessarily included.

Assess a lance for local targeting and a bar only as a verified compatible assembly. Organise work by water handling and trials, not fixed-output or measured-saving promises.
- Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations.
- Verify actual electrical supply, water protection and permission; 380 V is not explosion protection.
- Do not operate until surface, nozzle and accessory compatibility are verified.
- Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Outdoor hard floors: distinguish loose mud from bonded soil
J-3515H
Connect local soil removal, sediment collection and sectional reopening to reduce unnecessary wetting and repeat cleanup. Suitable nozzles, distance and a trial help protect compatible surfaces.

01 · What makes this task difficult?
Water-compatible factory/property hard floors can carry loose mud, wheel marks and bonded local soil. Re-deposition, access conflicts and insufficient supply/disposal are common problems. An image proves no pressure tolerance of stone, coatings or joints.
Loose sediment and bonded soil mix
Collect loose debris before trial-cleaning deposits
Cleaning affects traffic and nearby objects
Protect sensitive objects and plan supply, drainage and handover
02 · Why consider this Jinjie machine?
Match the current model’s power, pressure, flow and nozzle to local deposits on water-compatible hard surfaces, then manage sediment toward a collection route. Verify each machine’s supply rather than interchanging gasoline and electric configurations.
The current model and compatible lance nozzle
Collect loose debris before trial-cleaning deposits
Reduce repeated cleanup after scattering soil
Directed spraying and sectional work
Protect sensitive objects and plan supply, drainage and handover
Organise working time and finishing resources
J-3515H · Current information lists 15 L/min, a GX630 twin-cylinder petrol engine and AR pump. Verify the maximum/working basis of the 350bar(35MPa) entry; assess only open outdoor non-hazardous tasks.
03 · A better cleaning workflow and customer value
Connect local soil removal, sediment collection and sectional reopening to reduce unnecessary wetting and repeat cleanup. Suitable nozzles, distance and a trial help protect compatible surfaces.
Reduce repeated cleanup after scattering soil
Loose sediment and bonded soil mix · Collect loose debris before trial-cleaning deposits
Organise working time and finishing resources
Cleaning affects traffic and nearby objects · Protect sensitive objects and plan supply, drainage and handover
Match tools, the material and the working route before comparing labour, time, consumables and maintenance costs. The potential value depends on suitable conditions and correct operation; no fixed saving or damage-free result is promised.
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Compare related applications and models (7)
Compare each model’s actual drive, access, accessories and configuration on its own product page. Shared task guidance does not make the models interchangeable.
Working method, evidence and original professional analysis
Task-specific equipment selection
Outdoor hard floors: distinguish loose mud from bonded soil
Site, material and contamination
Water-compatible factory/property hard floors can carry loose mud, wheel marks and bonded local soil. Re-deposition, access conflicts and insufficient supply/disposal are common problems. An image proves no pressure tolerance of stone, coatings or joints.
Equipment basis and model differences
A single lance allows staged targeting of local soil. Water capacity and material tolerance drive the plan; higher pressure is not automatically better. Unresolved pressure terminology or delivered configurations of J-5015S, J-3515H and J-5022H are not recommended operating settings. Verify 380 V supply, electrical protection and cable management for J-1730D. Petrol units operate only in suitable open outdoor space away from doors/windows and air intakes. Do not borrow H/HS component materials.
Model configuration and selection
Check model-specific configurations against the machine and order before purchase.
| Model | Current basis and limits |
|---|---|
| J-3515H | Current information lists 15 L/min, a GX630 twin-cylinder petrol engine and AR pump. Verify the maximum/working basis of the 350bar(35MPa) entry; assess only open outdoor non-hazardous tasks. |
| J-3522H | Current information lists 22 L/min, Honda twin-cylinder petrol power and AR pump. Pressure terminology remains unresolved; no parallel-operator or time-saving promise is made. |
| J-5015S | The current page lists maximum 500bar(50MPa), 15 L/min and petrol positioning. Engine brand and delivered pressure configuration are order-specific. The single lance is standard; a surface cleaner and other attachments are optional. |
| J-5022H | The current page lists 22 L/min, petrol power and AR pump. A maximum-500bar(50MPa) headline coexists with unresolved terminology; it is not certified working pressure. |
| J-1730D | Current information lists 170bar(17MPa), 30 L/min and 380 V electric power. A long single lance is standard; flushing bars and rotary heads are optional, not evidence of simultaneous multi-gun capability. |
| J-1730HS | Model information lists maximum 170bar(17MPa), 30 L/min, GX390 petrol engine, AR pump and a 304 stainless-steel reel. Frame material is separate; a flushing bar is optional. |
| Site problem | Equipment / conditions | Suggested method | Potential value |
|---|---|---|---|
| Loose sediment and bonded soil mix | The current model and compatible lance nozzle | Collect loose debris before trial-cleaning deposits | Reduce repeated cleanup after scattering soil |
| Cleaning affects traffic and nearby objects | Directed spraying and sectional work | Protect sensitive objects and plan supply, drainage and handover | Organise working time and finishing resources |
Working method, accessories and site supply
- Prepare and trial · Collect larger debris first and identify finish, joints and soil. Trained staff trial under the machine and surface instructions.
- Supply, collection and separation · Verify sustained supply and waste collection; isolate sections without flushing sediment towards people or unauthorised drains.
- Single-lance work · Use compatible nozzle, distance and method under the instructions. Avoid electrics, loose finishes and sensitive parts; no unverified pressure setting is prescribed.
- Stop and hand over · Stop/depressurise before changing tools. Collect waste and inspect surface, slip risk and access before handover.
Limits and safety
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Questions for this task
Prepare site information
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
FAQ
Can a 500bar(50MPa) maximum rating be applied directly to property floors?
No. A maximum is not a recommended setting; verify working specification, surface tolerance and a trial.
Does more water remove the need for waste collection?
No. Supply, contaminant recovery and drainage capacity must be assessed together.
What site information is needed for selection?
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
Select equipment for the actual site
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
J-3515H · Selection enquiryCompare application plansOptional flushing bars: verify ratings rather than promising output by nozzle count
J-2815H
With compatible accessories and sufficient supply and disposal, coordinate flushing routes with collection to reduce blind tool changes and unnecessary passes. Assess equipment and labour costs against the actual scope.

01 · What makes this task difficult?
These original images show multi-outlet bars for compatible hard floors and loose residues. Assess coverage, transport and water handling rather than confusing multiple outlets with simultaneous operators.
Loose sediment needs organised collection
Trial toward collection before defining routes and coverage
Accessory and machine ratings may differ
Verify the configuration and supply instead of guessing from nozzle count
02 · Why consider this Jinjie machine?
A multi-nozzle flushing bar is an optional method for suitable hard-surface sediment only after rated pressure, flow, connections and machine compatibility are confirmed. It is not standard on every model and nozzle count does not establish output.
A confirmed compatible optional flushing tool
Trial toward collection before defining routes and coverage
Reduce repeated scattering and unnecessary travel
Rated pressure, flow and connection compatibility
Verify the configuration and supply instead of guessing from nozzle count
Reduce rework from incompatible tools
J-2815H · The current page lists 15 L/min, GX390 petrol power and an AR pump. Maximum/working pressure remains unresolved; do not infer it from the model. Verify a flushing bar by project.
03 · A better cleaning workflow and customer value
With compatible accessories and sufficient supply and disposal, coordinate flushing routes with collection to reduce blind tool changes and unnecessary passes. Assess equipment and labour costs against the actual scope.
Reduce repeated scattering and unnecessary travel
Loose sediment needs organised collection · Trial toward collection before defining routes and coverage
Reduce rework from incompatible tools
Accessory and machine ratings may differ · Verify the configuration and supply instead of guessing from nozzle count
Match tools, the material and the working route before comparing labour, time, consumables and maintenance costs. The potential value depends on suitable conditions and correct operation; no fixed saving or damage-free result is promised.
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Compare related applications and models (4)
Compare each model’s actual drive, access, accessories and configuration on its own product page. Shared task guidance does not make the models interchangeable.
Working method, evidence and original professional analysis
Task-specific equipment selection
Optional flushing bars: verify ratings rather than promising output by nozzle count
Site, material and contamination
These original images show multi-outlet bars for compatible hard floors and loose residues. Assess coverage, transport and water handling rather than confusing multiple outlets with simultaneous operators.
Equipment basis and model differences
Bars for J-2815H, J-1730D, J-1730HS and J-2050H are model/order-specific options, not standard equipment because they appear in an illustration. Obtain compatibility data for nozzle count/bore, total flow, rated pressure, connections and hose. Without it, select no attachment and promise no parallel work or time saving. The pictured bar establishes the illustrated method, not the delivered accessory model, working pressure or area output. J-1730HS's 304 statement covers its reel, not the bar or frame.
Model configuration and selection
Check model-specific configurations against the machine and order before purchase.
| Model | Current basis and limits |
|---|---|
| J-2815H | The current page lists 15 L/min, GX390 petrol power and an AR pump. Maximum/working pressure remains unresolved; do not infer it from the model. Verify a flushing bar by project. |
| J-1730D | Current information lists 170bar(17MPa), 30 L/min and 380 V electric power. A long single lance is standard; flushing bars and rotary heads are optional, not evidence of simultaneous multi-gun capability. |
| J-1730HS | Model information lists maximum 170bar(17MPa), 30 L/min, GX390 petrol engine, AR pump and a 304 stainless-steel reel. Frame material is separate; a flushing bar is optional. |
| J-2050H | Current information lists 200bar(20MPa), 50 L/min and petrol power. Do not borrow HS materials or another model's pipe-size range. A flushing bar is project-specific optional equipment. |
| Site problem | Equipment / conditions | Suggested method | Potential value |
|---|---|---|---|
| Loose sediment needs organised collection | A confirmed compatible optional flushing tool | Trial toward collection before defining routes and coverage | Reduce repeated scattering and unnecessary travel |
| Accessory and machine ratings may differ | Rated pressure, flow and connection compatibility | Verify the configuration and supply instead of guessing from nozzle count | Reduce rework from incompatible tools |
Working method, accessories and site supply
- Verify the assembly · Have the supplier confirm ratings, nozzles and connections against actual working conditions. Until confirmed, discuss only; do not operate.
- Check surface and disposal · Assess water-compatible material, joints, soil and waste recovery; segregate people and vehicles.
- Trained trial · Trial only the confirmed assembly under its instructions, observing reaction, residues and collection; stop for abnormalities.
- Stop and maintain · Stop and release pressure before disassembly, nozzle changes or blockage removal.
Limits and safety
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Questions for this task
Prepare site information
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
FAQ
Can output be calculated from the number of pictured nozzles?
No. Flow, nozzle, surface, soil and route affect results.
Is a multi-outlet bar the same as multiple operators with guns?
No. These are different assemblies requiring separate flow-division, accessory and safety verification.
What site information is needed for selection?
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
Select equipment for the actual site
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
J-2815H · Selection enquiryCompare application plansDrain edges and open service entrances: surface rinsing is not pipe jetting
J-1020D
Collect loose sediment before local rinsing and recovery to reduce repeated work caused by pushing waste back into openings. Protect compatible materials, electrics and adjacent areas for an orderly handover.

01 · What makes this task difficult?
Two original J-1020D images show lance work on floors and channel edges. The task is compatible service-area hard flooring, loose mud and residues, with collection to avoid merely pushing waste into a blocked opening. Visible water does not prove pipe clearance.
Sediment remains around openings and floor edges
Collect debris, trial the surface and inspect drainage
Service entrances adjoin electrics and people
Protect sockets and gaps, then plan collection and handover
02 · Why consider this Jinjie machine?
Assess J-1020D’s current electric lance configuration for local surface rinsing at service entrances and channel edges, coordinating spray direction, electrical protection and collection. Surface rinsing is not internal pipe jetting.
Compatible local lance cleaning
Collect debris, trial the surface and inspect drainage
Reduce repeat cleanup from pushing waste back into openings
Local work with protection and separation
Protect sockets and gaps, then plan collection and handover
Reduce avoidable disruption and rework
J-1020D · Current information lists 100bar(10MPa), 20 L/min, a 30 m hose and electric operation. Hose length is not guaranteed jetting reach; confirm the actual electrical supply on the nameplate.
03 · A better cleaning workflow and customer value
Collect loose sediment before local rinsing and recovery to reduce repeated work caused by pushing waste back into openings. Protect compatible materials, electrics and adjacent areas for an orderly handover.
Reduce repeat cleanup from pushing waste back into openings
Sediment remains around openings and floor edges · Collect debris, trial the surface and inspect drainage
Reduce avoidable disruption and rework
Service entrances adjoin electrics and people · Protect sockets and gaps, then plan collection and handover
Match tools, the material and the working route before comparing labour, time, consumables and maintenance costs. The potential value depends on suitable conditions and correct operation; no fixed saving or damage-free result is promised.
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Compare related applications and models (2)
Compare each model’s actual drive, access, accessories and configuration on its own product page. Shared task guidance does not make the models interchangeable.
Working method, evidence and original professional analysis
Task-specific equipment selection
Drain edges and open service entrances: surface rinsing is not pipe jetting
Site, material and contamination
Two original J-1020D images show lance work on floors and channel edges. The task is compatible service-area hard flooring, loose mud and residues, with collection to avoid merely pushing waste into a blocked opening. Visible water does not prove pipe clearance.
Equipment basis and model differences
The current 100bar(10MPa), 20 L/min electric positioning supports local-task assessment; verify nameplate supply rather than borrowing another model's voltage. Specialist surface tools are project-specific options. The images show a lance, not hose-fed jetting or large-area scrubbing. Even open service entrances require checks of electrics, supply, drainage and people. Indoor or sensitive sites need separate assessment.
Model configuration and selection
Check model-specific configurations against the machine and order before purchase.
| Model | Current basis and limits |
|---|---|
| J-1020D | Current information lists 100bar(10MPa), 20 L/min, a 30 m hose and electric operation. Hose length is not guaranteed jetting reach; confirm the actual electrical supply on the nameplate. |
| Site problem | Equipment / conditions | Suggested method | Potential value |
|---|---|---|---|
| Sediment remains around openings and floor edges | Compatible local lance cleaning | Collect debris, trial the surface and inspect drainage | Reduce repeat cleanup from pushing waste back into openings |
| Service entrances adjoin electrics and people | Local work with protection and separation | Protect sockets and gaps, then plan collection and handover | Reduce avoidable disruption and rework |
Working method, accessories and site supply
- Identify · Assess blockage, waste and material first; remove larger items and collectable sediment.
- Protect and separate · Plan electrical/water separation, access controls and recovery. Spray no sockets, cabinets or door gaps.
- Trial locally · Trial under the manual on a representative surface and recover residues; stop for backflow or abnormal drainage.
- Inspect · Check opening and floor without treating a clean surface as acceptance of pipe structure or drainage capacity.
Limits and safety
Exclude petrol units from underground, indoor and exhaust-trapping semi-enclosed locations. Verify actual electrical supply, water protection and permission; 380 V is not explosion protection. Do not operate until surface, nozzle and accessory compatibility are verified. Provide suitable waste recovery/disposal; original images do not prove customer delivery.
Questions for this task
Prepare site information
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
FAQ
Does rinsing an opening mean the pipe is cleared?
No. Surface rinsing and internal maintenance are different tasks; check actual drainage.
Can sludge simply be washed into a storm drain?
Do not assume permission; verify collection and site disposal requirements.
What site information is needed for selection?
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
Select equipment for the actual site
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
J-1020D · Selection enquiryCompare application plansQuestions before selecting equipment
Should lightly soiled property floors use the highest pressure?
Do not choose by a maximum. Assess material, soil, working specification and a trial, comparing more suitable equipment where needed.
What determines petrol versus electric selection?
Assess outdoor/exhaust conditions, actual power, mobility and water handling rather than appearance.
Prepare the site details
Provide surface/joint and soil photos, area, access times, supply/recovery route, actual power and configuration list.
Rental is subject to actual availability and project assessment; no model, stock or price is promised.









