J-D5R · Planning cleaning routes with 90/95L tanks

Plan water use, draining and opening hours around the actual site.

Planning cleaning routes with 90/95L tanks

Work and transfers

Record driving, water servicing, transfers and daily care; do not derive staffing substitution from 3200m²/h.

Energy and support

Use actual charging and battery-care records rather than invented runtime or electricity costs.

Consumables and care

Include brushes, blades and daily cleaning over the service period, using actual wear.

Plan short sections around opening hours

Begin near the water point and schedule entrances or busy aisle crossings when foot traffic is lowest. At the end of a trial section, record the solution remaining, the recovery level and the time spent travelling to and from the service point. Use those figures to join neighbouring sections.

Plan for whichever tank reaches its limit first

Solution setting, foam and standing water all affect the usable distance between stops. Use the 90 L solution and 95 L recovery capacities as planning inputs. Time a full run that includes refilling, draining and rinsing the recovery tank.

View J-D5R specifications Discuss site suitability