J-D5R · Planning cleaning routes with 90/95L tanks
Plan water use, draining and opening hours around the actual site.
Work and transfers
Record driving, water servicing, transfers and daily care; do not derive staffing substitution from 3200m²/h.
Energy and support
Use actual charging and battery-care records rather than invented runtime or electricity costs.
Consumables and care
Include brushes, blades and daily cleaning over the service period, using actual wear.
Plan short sections around opening hours
Begin near the water point and schedule entrances or busy aisle crossings when foot traffic is lowest. At the end of a trial section, record the solution remaining, the recovery level and the time spent travelling to and from the service point. Use those figures to join neighbouring sections.
Plan for whichever tank reaches its limit first
Solution setting, foam and standing water all affect the usable distance between stops. Use the 90 L solution and 95 L recovery capacities as planning inputs. Time a full run that includes refilling, draining and rinsing the recovery tank.
View J-D5R specifications Discuss site suitability