CN EN

J-D9R · Planning routes with 140/150L tanks

Include water points, soil and transfer time rather than relying on the efficiency figure.

Planning routes with 140/150L tanks

People and routes

Record cleaning, transfer and water-servicing time; do not calculate staffing from 5500m²/h.

Energy and support

Use actual charging, battery-care and site-support records.

Consumables and maintenance

Include brushes, squeegee blades, daily cleaning and maintenance arrangements.

Map main aisles and water points together

Mark turning areas, water points and places to drain before testing. Work the continuous aisles in long runs and split sections that involve frequent detours. Time a representative section, counting turns, pedestrian stops and travel to the service point.

Let the trial determine the section limits

Record the remaining solution in the 140 L tank and the level in the 150 L recovery tank. Observe standing water and foam as well. Schedule servicing where whichever system reaches its operating limit first. Record completed area, floor condition and total shift time for comparison.

View J-D9R specifications Discuss site suitability