CN EN

Selected model: P-103

Typical application

P-103 | Office corridor floor care

P-103

Office corridor floor careConfirm suitability against the site material and cleaning process, and test a small area first.

Office corridor floor care
Office corridor floor care

The task at this site

Office corridor floor careConfirm suitability against the site material and cleaning process, and test a small area first.

Before confirming the equipment

  • Check the current product label, suitable materials and dilution instructions.
  • Assess ventilation, protection and compatibility; test a small inconspicuous area.
  • Follow the label for application, subsequent treatment and storage.

Work sequence

  1. Identify the surface and soil.
  2. Confirm product suitability and the label instructions.
  3. Test a small area before applying the agreed method.
  4. Inspect and complete subsequent treatment as the label requires.

Configuration and consultation

Use the linked product page to confirm specifications and supplied or optional accessories. Send site photos and operating conditions for model selection; availability and final configuration require confirmation.