CN EN

Selected model: PH-201

Typical application

PH-201 | Base-layer care of public corridors

PH-201

Base-layer care of public corridorsConfirm suitability against the site material and cleaning process, and test a small area first.

Base-layer care of public corridors
Base-layer care of public corridors

The task at this site

Base-layer care of public corridorsConfirm suitability against the site material and cleaning process, and test a small area first.

Before confirming the equipment

  • Check the current product label, suitable materials and dilution instructions.
  • Assess ventilation, protection and compatibility; test a small inconspicuous area.
  • Follow the label for application, subsequent treatment and storage.

Work sequence

  1. Identify the surface and soil.
  2. Confirm product suitability and the label instructions.
  3. Test a small area before applying the agreed method.
  4. Inspect and complete subsequent treatment as the label requires.

Configuration and consultation

Use the linked product page to confirm specifications and supplied or optional accessories. Send site photos and operating conditions for model selection; availability and final configuration require confirmation.