Selected model: HD18
Typical application
HD18 | Conditions for stone crystallisation care
HD18
Identify the stone and existing finish, then check treatment compatibility, pads and slip-control arrangements.

Before work
Confirm the surface, contamination, access and available working window. Use this model’s documented configuration and the site operator’s safety requirements.
Work sequence
Agree a small-area trial, isolate the working area and arrange utilities and collection as applicable. Do not treat the picture as proof of a measured result.
Inspection and maintenance
Inspect the result with the operator. Check the machine or consumable using the original instructions; stop and seek advice if compatibility is uncertain.