CN EN
Location:Home > Applications > Heavy-duty cleaning for ships, factories and construction vehicles
Application plan: heavy-duty washing

Heavy-duty cleaning for ships, factories and construction vehicles

For ship undersides, construction vehicles, factory equipment and heavy outdoor soil; assess pressure, flow, duration and power.

这份方案可作为选型参考。我们会结合现场评估和试机情况,与您核对设备型号、数量、清洁剂和附件。

Heavy-duty washing equipment configuration reference
选型前需要了解什么

了解您的现场,一起确定设备配置

欢迎把您已掌握的现场情况发给我们。这些信息能帮助我们缩小选型范围,并进一步核对设备数量、附件和报价。

01

Zone areas, narrowest access, doorways and lift dimensions

02

Floor/target material, contamination source and severity

03

Daily frequency, deadline, shifts and visitor/production avoidance windows

04

Power, refilling, wastewater, charging, storage and equipment transfer

05

Noise, slip safety, mixed traffic, chemicals and wastewater requirements

06

Existing machines, consumable stock, maintenance skills and acceptance criteria

Site challenges

Common ship/heavy-industry washing challenges

01

Heavy oil, rust and large structures demand intensive washing

02

Continuous operation demands suitable pumps, filtration and durability

03

Complex safety, protection and wastewater boundaries

Suggested configuration

Combine equipment by task; one model does not cover every condition

Categories/models are discussion starting points; confirm site conditions before final configuration.

Application branches

Different soil, scale and shifts require different configurations even in similar sites

Choose the main approach for the site; use alternatives for access, power, transfer or duration limits.

01

Light/moderate soil, equipment surfaces and fixed-point washing

Initial recommendation
Electric pressure washer + fan nozzle
Alternative method
Consider petrol power when stable electricity is unavailable
Selection basis
Determine tolerable pressure/distance from material first
02

Heavy oil, rust or stubborn deposits

Initial recommendation
High-flow pressure washer + pretreatment/rotary nozzle
Alternative method
Trial blasting/custom systems separately
Selection basis
Pressure alone is insufficient; flow and attachments also affect performance
03

Long distances, continuous shifts or fixed stations

Initial recommendation
Industrial pump + filtered water supply + pressure reel
Alternative method
Custom connected systems for multiple workstations
Selection basis
Include water supply, cooling, wastewater and maintenance
Chemical selection

Choose chemicals by contamination and floor; do not use one everywhere

These are supporting options. Follow labels, safety data sheets and equipment manuals; trial compatibility inconspicuously.

Cleaning chemical

Neutral surface cleaner

Application: equipment housings, ordinary dust and maintenance washing

Verify electrical isolation/material compatibility; avoid spraying seals and controls directly

Cleaning chemical

Industrial degreaser

Application: oil film, grease and heavy machinery soil

Pretreat and recover wastewater; trial coatings/aluminium first

Cleaning chemical

Specialist rust/paint-removal chemical

Application: metal refurbishment and stubborn coatings

Coordinate protection, waste-liquid disposal and subsequent rust prevention; no generalized use

Safety note:Do not mix acids, alkalis, chlorine products or disinfectants. Reconfirm food, medical, electronics, antistatic-floor and wastewater requirements with site management.

Attachment selection

Match brushes, blades, nozzles, filters and hoses to each task

Attachments affect results, surface protection, recovery and downtime. Prepare wear-part/spares lists when purchasing machines.

Attachments

Fan, rotary and adjustable nozzles

Application: broad rinsing through stubborn-deposit removal

Control impact with spray pattern and distance to reduce damage

Attachments

Pressure reel, extension lance and surface cleaner

Application: facades, distant targets and large flat surfaces

Improve coverage and operating productivity

Attachments

Inlet filters, blasting attachments and protective equipment

Application: continuous duty, rust removal and specialist materials

Protects pump and controls high-pressure splash

Implementation steps

From assessment and trials to equipment delivery

Assess before/after cleaning, area covered per time, wastewater pickup, residue and consumable wear.

01

Confirm target, material and work cycle

Record selection reasoning, configuration limits, chemical/attachment combinations and site conditions requiring confirmation.

02

Configure pumps, attachments and pretreatment equipment

Record selection reasoning, configuration limits, chemical/attachment combinations and site conditions requiring confirmation.

03

Verify safety, protection and maintenance planning

Record selection reasoning, configuration limits, chemical/attachment combinations and site conditions requiring confirmation.

Intended outcome

Main intended improvements

Improve heavy-soil removal/washing capability
Reduce unplanned equipment downtime
Supports fixed-station or mobile-system customization
Acceptance and evidence

Validate with site records, not marketing claims

For a representative test area, record the initial condition, equipment, attachments, chemical dilution, time and finish at the same point. Agree the handover criteria using these records.

Project evidence and application references

Check authenticity labels before using configuration/delivery references

View all cases
FAQ

Heavy-duty washing questions

Who is this plan for?

Mainly ship/heavy-industry washing; confirm area, routes, contamination and shifts.

怎样确认设备配置适合我的场地?

请先核对通道宽度、供电供水、连续作业时间和预算,再根据试机情况确定型号。

What support can Wan Sheng Long provide?

Site discussions, selection, trial advice, training, consumables, parts and maintenance support are available.

Site-plan enquiry

Submit area, contamination and frequency

Wan Sheng Long advises on equipment direction, model comparison, trials, training and service based on site conditions.

Submit site requirements0755-25621811